CRBTRA Guardrail
Sector: Bridge • Location: Boardman, Oregon, United States of America
Source: Dodge USA
Supply and Install new ODOT compliant guardrail, impact absorbing terminations to concrete bridge rail (approx. 2660 total ft). Configuration includes 6 separate runs, 7 impact terminations, 4 transitions, and 1 tie into existing GR. Some hand work required for geogrid present in embankment. AIS 2014 requirements must be met on all materials.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Supply and Install new ODOT compliant guardrail, impact absorbing terminations to concrete bridge rail (approx. 2660 total ft). Configuration includes 6 separate runs, 7 impact terminations, 4 transitions, and 1 tie into existing GR. Some hand work required for geogrid present in embankment. AIS 2014 requirements must be met on all materials. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
