Creative Hub Worcester Redevelopment
Sector: Commercial • Location: Worcester, Massachusetts, USA
Source: Patch
The long-vacant historic Boys Club building in Worcester, MA, was transformed into a new community arts destination. The 30,000-square-foot space, built in 1914, was converted into a space for new and established artists with dedicated studio space, community building, and artistic events. It also provides over 80 fully subsidized toddler and preschool childcare slots and hosts events promoting ar
- Status
- Closed
- Sector
- Commercial
- Location
- Worcester, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about Creative Hub Worcester Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The long-vacant historic Boys Club building in Worcester, MA, was transformed into a new community arts destination. The 30,000-square-foot space, built in 1914, was converted into a space for new and established artists with dedicated studio space, community building, and artistic events. It also provides over 80 fully subsidized toddler and preschool childcare slots and hosts events promoting artistic and diverse cultures. |
Original sector | Community Arts and Childcare |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Worcester |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in USA
- Widen Turnpike Minneola Interchange to US 27
- Central Florida WrongWay Detection Technology Implementation Project
- Widen Sawgrass from North of Oakland Park Blvd to South of Atlantic Blvd
- Queue Warning Installation Project Systemwide
- Sand Lake Interchange
- Treasure Coast Turnpike Mainline Widening Projects
- Central Polk Parkway US 17 to SR 60
- Widen Sawgrass Expressway from North of Atlantic Blvd to North of Sample Rd
