logo
ProjectPre-Design

Creekside Battery Energy Storage (BESS)

Pre-design · Ontario · Last reported May 2024

Source: Dodge USA

A proposed Battery Energy Storage (BESS) with a capacity of 230 MW on a 15-acre property on the northwest corner of Gilmour Road and South Branch Road (north).

Status
Prospective
Sector
Road, Energy Storage, Power Generation (CCGT), Consumer Products, Commercial, Raw Materials
Location
Brinston, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Creekside Battery Energy Storage (BESS)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Creekside Battery Energy Storage (BESS)” is an infrastructure initiative in the Road sector, located in Brinston, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed Battery Energy Storage (BESS) with a capacity of 230 MW on a 15-acre property on the northwest corner of Gilmour Road and South Branch Road (north).

Budget

Location

Country

Canada

State

Ontario

City

Brinston

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Energy Storage, Power Generation (CCGT), Consumer Products, Commercial, Raw Materials

Article published date

2024-07-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project