Creekstone Gigasite Data Center Solar-Storage Baseload Addition
The owner, status and timeline of this project. A free account opens every field.
Source: POWER Magazine
Zeo Energy Corp. signed a non-binding MOU with Creekstone Energy to study the development of 280 MW of solar-plus-storage generation to support baseload power supply for Creekstone's multi-gigawatt data center campus under construction in Millard County, Utah. The project is in early design and will likely rely on conventional photovoltaic systems paired with long-duration storage, potentially the
- Status
- Prospective
- Sector
- Energy Storage, Solar, Geothermal, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Data Center
- Location
- Delta, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- POWER Magazine
ConstructChat
Ask ConstructChat about Creekstone Gigasite Data Center Solar-Storage Baseload Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Zeo Energy Corp. signed a non-binding MOU with Creekstone Energy to study the development of 280 MW of solar-plus-storage generation to support baseload power supply for Creekstone's multi-gigawatt data center campus under construction in Millard County, Utah. The project is in early design and will likely rely on conventional photovoltaic systems paired with long-duration storage, potentially thermal, chemical, or electrochemical. The project aims to provide reliable, dispatchable electricity through solar power firmed with long-duration storage. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Utah |
City | Delta |
Source
Source | POWER Magazine |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Solar, Geothermal, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Data Center |
Article published date | 2026-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
