logo

Creighton Road Bridge 089 Rehabilitation

Sector: Steel • Location: Hamilton, Ontario, Canada

Source: Dodge USA

Project
Bidding

Bridge #89 is located on Creighton Road, Hamilton, On, over Spencer Creek, 30 metres South of Mill Street. Placing a concrete overlay on deck Replacement of sidewalks Replacement of steel handrails with concrete parapet walls Semi-integral abutment conversion at north abutment Integration of existing approach slab and deck at south side, reapply asphalt paving Superstructure and substructure concr

Status
Prospective
Sector
Steel, Cement, Water Supply and Storage, Bridge, Waste Processing and Treatment, Car parking, Road, Government, Automotive, Metal, Commercial, Manufacturing (Industrial)
Location
Hamilton, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Creighton Road Bridge 089 Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Creighton Road Bridge 089 Rehabilitation” is an infrastructure initiative in the Steel sector, located in Hamilton, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge #89 is located on Creighton Road, Hamilton, On, over Spencer Creek, 30 metres South of Mill Street. Placing a concrete overlay on deck Replacement of sidewalks Replacement of steel handrails with concrete parapet walls Semi-integral abutment conversion at north abutment Integration of existing approach slab and deck at south side, reapply asphalt paving Superstructure and substructure concrete repair Replacement of east retaining walls Rehabilitation of the suspended sewer pipe.

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Hamilton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Cement, Water Supply and Storage, Bridge, Waste Processing and Treatment, Car parking, Road, Government, Automotive, Metal, Commercial, Manufacturing (Industrial)

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project