logo
ProjectBidding

Crescent Beach Force Main - Phase 1

Bidding · British Columbia · Last reported Jan 2021

Source: Dodge USA

Metro Vancouver has a twinned sanitary sewer system that conveys flows from the Crescent Beach Pump Station (CBPS) to the South Surrey Interceptor (SSI) in the City of Surrey, BC. It consists of an existing 500 mm diameter fiber-reinforced plastic Force Main, referred to as the Crescent Beach Force Main (CBFM), as well as an existing 750 mm diameter steel force main, referred to as the Crescent Be

Status
Prospective
Sector
Mass Transit, Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial, Manufacturing (Industrial)
Location
Surrey, British Columbia, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Crescent Beach Force Main - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Crescent Beach Force Main - Phase 1” is an infrastructure initiative in the Mass Transit sector, located in Surrey, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Metro Vancouver has a twinned sanitary sewer system that conveys flows from the Crescent Beach Pump Station (CBPS) to the South Surrey Interceptor (SSI) in the City of Surrey, BC. It consists of an existing 500 mm diameter fiber-reinforced plastic Force Main, referred to as the Crescent Beach Force Main (CBFM), as well as an existing 750 mm diameter steel force main, referred to as the Crescent Beach Force Main 2 (CBFM2). Phase 1 of this project is to upsize and replace the most northern reac...

Procurement method

Location

Country

Canada

State

British Columbia

City

Surrey

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Mass Transit, Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project