Crescent Beach Pump Station Discharge Pipe Replacement
Sector: Water Supply and Storage • Location: Vancouver, British Columbia, Canada
Source: Dodge USA
The work includes the Contractor to design, supply, install, operate, monitor, and remove the temporary bypass pumping system to allow other work (not part of this Contract) to happen in the Crescent Beach Pump Station underground wet well and underground valve chamber.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Vancouver, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crescent Beach Pump Station Discharge Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the Contractor to design, supply, install, operate, monitor, and remove the temporary bypass pumping system to allow other work (not part of this Contract) to happen in the Crescent Beach Pump Station underground wet well and underground valve chamber. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
