Crest Pump Station Construction
Sector: Water Supply and Storage • Location: Novato, California, United States of America
Source: Dodge USA
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as CREST PUMP STATION according to drawings and specifications as prepared by the North Marin Water District and according to the Contract Documents. The Work includes, but is not limited to: 1. Erosion Control 2. Clearing and Grading 3. Construction of a concrete a
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Novato, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crest Pump Station Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as CREST PUMP STATION according to drawings and specifications as prepared by the North Marin Water District and according to the Contract Documents. The Work includes, but is not limited to: 1. Erosion Control 2. Clearing and Grading 3. Construction of a concrete and wood framed structure (~ 600 SF) 4. Providing power from the main switchgear 5. Furnishing, in... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Novato |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
