logo

Critical Care Addition - Switchgear Replacement

Sector: Hospital • Location: Saint Louis, Missouri, United States of America

Source: Dodge

Project
Closed

Replace the controls for Generators 6/7 switch gear. JUSTIFICATION: The controls are obsolete and have failed three times. Engineering Services has been able to repair them so far, but parts are no longer available. Without the controls, the generators can't start and CCA will be left with no emergency power on any branch (life safety, critical, or equipment branche

Status
Closed
Sector
Hospital, Government, Power Generation (CCGT), Hotel, Manufacturing (Industrial), Commercial
Location
Saint Louis, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Critical Care Addition - Switchgear Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Critical Care Addition - Switchgear Replacement” is an infrastructure initiative in the Hospital sector, located in Saint Louis, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace the controls for Generators 6/7 switch gear. JUSTIFICATION: The controls are obsolete and have failed three times. Engineering Services has been able to repair them so far, but parts are no longer available. Without the controls, the generators can't start and CCA will be left with no emergency power on any branch (life safety, critical, or equipment branche

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Saint Louis

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Hospital, Government, Power Generation (CCGT), Hotel, Manufacturing (Industrial), Commercial

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project