logo

CROMLEY ROAD FROM W LANE ST TO S OF SPENCE DR IN BROOKLET

Sector: Water Supply and Storage • Location: Brooklet, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The City of Brooklet proposed project is 0.67 miles, beginning at the intersection of Cromley Road and W. Lane Street and travelling north across US 80 ending at the driveway of the tennis courts. The existing road sections appear to generally have no existing curb and gutter. There appears to be multiple existing utility poles behind the existing sidewalk locations. The location of utility poles

Project Information FAQ

Project Information

3 Q
The project “CROMLEY ROAD FROM W LANE ST TO S OF SPENCE DR IN BROOKLET” is an infrastructure initiative in the Water Supply and Storage sector, located in Brooklet, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City of Brooklet proposed project is 0.67 miles, beginning at the intersection of Cromley Road and W. Lane Street and travelling north across US 80 ending at the driveway of the tennis courts. The existing road sections appear to generally have no existing curb and gutter. There appears to be multiple existing utility poles behind the existing sidewalk locations. The location of utility poles are indicators of existing Right-of-Way (ROW) limits. This project would include a 5-foot-wide sidewalk along one side of the roadway, crosswalks, striping, signage, and other safety measures up to the intersection of Cromley and US 80. From US 80 only storm sewer improvements are proposed. The storm sewer improvements end at the intersection of the driveway to the tennis courts.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data