logo
ProjectPlanned

Crosby Bulk Infrastructure Project

Sector: Water Supply and Storage • Location: Johannesburg, Gauteng, South Africa

Source: The Citizen

The Crosby Bulk Infrastructure Project aims to augment the inflow into the HH2 reservoir to alleviate pressure on the existing water supply system. This project is currently out for tender and is part of the broader infrastructure upgrades planned by Johannesburg Water.

Status
Prospective
Sector
Water Supply and Storage
Location
Johannesburg, Gauteng, South Africa
Updated
19 Nov 2026
Source
The Citizen

ConstructChat

Ask ConstructChat about Crosby Bulk Infrastructure Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Crosby Bulk Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Johannesburg, Gauteng, South Africa. Taiyo aggregates data on it from The Citizen.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Crosby Bulk Infrastructure Project aims to augment the inflow into the HH2 reservoir to alleviate pressure on the existing water supply system. This project is currently out for tender and is part of the broader infrastructure upgrades planned by Johannesburg Water.

Original sector

Water Supply

Location

Country

South Africa

State

Gauteng

City

Johannesburg

Source

Source

The Citizen

URL

More Details

Record type

Project

Sector

Water Supply and Storage

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project