Crosby Bulk Infrastructure Project
Sector: Water Supply and Storage • Location: Johannesburg, Gauteng, South Africa
Source: The Citizen
The Crosby Bulk Infrastructure Project aims to augment the inflow into the HH2 reservoir to alleviate pressure on the existing water supply system. This project is currently out for tender and is part of the broader infrastructure upgrades planned by Johannesburg Water.
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- Johannesburg, Gauteng, South Africa
- Updated
- 19 Nov 2026
- Source
- The Citizen
ConstructChat
Ask ConstructChat about Crosby Bulk Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Crosby Bulk Infrastructure Project aims to augment the inflow into the HH2 reservoir to alleviate pressure on the existing water supply system. This project is currently out for tender and is part of the broader infrastructure upgrades planned by Johannesburg Water. |
Original sector | Water Supply |
Location
Country | South Africa |
State | Gauteng |
City | Johannesburg |
Source
Source | The Citizen |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
