logo

Cross-river tunnel project of Songshan Road

Sector: Commercial • Location: China

Source: World Bank Group

Project
Active

The project includes the construction of the river crossing tunnel, the integrated pipe gallery, the ground wiring project and the supporting ancillary projects. The total length of the project is 4600 (including ground wiring roads), in which the tunnel section is about 4,450 meters long (including the shield section length of about 3210 meters), the tunnel shield section has an outer diameter of

Status
Prospective
Sector
Commercial, Mass Transit, Wind, Rail, Road, Tunnel, Government, Bridge
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cross-river tunnel project of Songshan Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cross-river tunnel project of Songshan Road” is an infrastructure initiative in the Commercial sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes the construction of the river crossing tunnel, the integrated pipe gallery, the ground wiring project and the supporting ancillary projects. The total length of the project is 4600 (including ground wiring roads), in which the tunnel section is about 4,450 meters long (including the shield section length of about 3210 meters), the tunnel shield section has an outer diameter of 14.5 meters, an inner diameter of 13.3 meters, and a lane height of 4.5 meters. The lane setting, the main line design speed of 80 km / h, the ramp design speed of 40 km / h. There is a pair of parallel ramps, two wind towers, and a building area of ??about 2235 square meters. The pipe deck is laid separately for about 1600 meters (subject to the actual measurement), and the cross-river shield section is built with the main body of the tunnel. The cooperation period is 23.5 years, of which the project construction period is 3.5 years and the operation period is 20 years. SPV is Hangzhou Minshan Road Crossing River Tunnel Management Co., Ltd., a JV between the sponsors China Railway 14th Bureau Group Co., Ltd. (34%), Jiaxing Chengxi Investment Partnership (Limited Partnership) (51%) and Hangzhou Qianjiang New City Construction Development Co., Ltd. (15%). Financial close took place on February 25, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0df83f8345ec4cc3b7492096fa6b2b0b

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Mass Transit, Wind, Rail, Road, Tunnel, Government, Bridge

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project