Cross-river tunnel project of Songshan Road
Sector: Commercial • Location: China
Source: World Bank Group
The project includes the construction of the river crossing tunnel, the integrated pipe gallery, the ground wiring project and the supporting ancillary projects. The total length of the project is 4600 (including ground wiring roads), in which the tunnel section is about 4,450 meters long (including the shield section length of about 3210 meters), the tunnel shield section has an outer diameter of
- Status
- Prospective
- Sector
- Commercial, Mass Transit, Wind, Rail, Road, Tunnel, Government, Bridge
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cross-river tunnel project of Songshan Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the construction of the river crossing tunnel, the integrated pipe gallery, the ground wiring project and the supporting ancillary projects. The total length of the project is 4600 (including ground wiring roads), in which the tunnel section is about 4,450 meters long (including the shield section length of about 3210 meters), the tunnel shield section has an outer diameter of 14.5 meters, an inner diameter of 13.3 meters, and a lane height of 4.5 meters. The lane setting, the main line design speed of 80 km / h, the ramp design speed of 40 km / h. There is a pair of parallel ramps, two wind towers, and a building area of ??about 2235 square meters. The pipe deck is laid separately for about 1600 meters (subject to the actual measurement), and the cross-river shield section is built with the main body of the tunnel. The cooperation period is 23.5 years, of which the project construction period is 3.5 years and the operation period is 20 years. SPV is Hangzhou Minshan Road Crossing River Tunnel Management Co., Ltd., a JV between the sponsors China Railway 14th Bureau Group Co., Ltd. (34%), Jiaxing Chengxi Investment Partnership (Limited Partnership) (51%) and Hangzhou Qianjiang New City Construction Development Co., Ltd. (15%). Financial close took place on February 25, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0df83f8345ec4cc3b7492096fa6b2b0b |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Mass Transit, Wind, Rail, Road, Tunnel, Government, Bridge |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant
