logo

Cross-river tunnel project of Songshan Road

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Active

The project includes the construction of the river crossing tunnel, the integrated pipe gallery, the ground wiring project and the supporting ancillary projects. The total length of the project is 4600 (including ground wiring roads), in which the tunnel section is about 4,450 meters long (including the shield section length of about 3210 meters), the tunnel shield section has an outer diameter of

Project Information FAQ

Project Information

4 Q
The project “Cross-river tunnel project of Songshan Road” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the construction of the river crossing tunnel, the integrated pipe gallery, the ground wiring project and the supporting ancillary projects. The total length of the project is 4600 (including ground wiring roads), in which the tunnel section is about 4,450 meters long (including the shield section length of about 3210 meters), the tunnel shield section has an outer diameter of 14.5 meters, an inner diameter of 13.3 meters, and a lane height of 4.5 meters. The lane setting, the main line design speed of 80 km / h, the ramp design speed of 40 km / h. There is a pair of parallel ramps, two wind towers, and a building area of ??about 2235 square meters. The pipe deck is laid separately for about 1600 meters (subject to the actual measurement), and the cross-river shield section is built with the main body of the tunnel. The cooperation period is 23.5 years, of which the project construction period is 3.5 years and the operation period is 20 years. SPV is Hangzhou Minshan Road Crossing River Tunnel Management Co., Ltd., a JV between the sponsors China Railway 14th Bureau Group Co., Ltd. (34%), Jiaxing Chengxi Investment Partnership (Limited Partnership) (51%) and Hangzhou Qianjiang New City Construction Development Co., Ltd. (15%). Financial close took place on February 25, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0df83f8345ec4cc3b7492096fa6b2b0b

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data