Crossover Cable Replacement at Lock and Dam
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work consists of replacing segments of circuits Dam Feeder No.1 and Dam Feeder No. 2 and the removal of unused cables located in the crossover system at Lock and Dam No. 2 in Hastings, MN. The cable segments requiring replacement start at manhole 1 and end at manhole 2 as shown in Figure 1-1 (see SOW Attachments). Dewatering the crossover system is required to access the cables. Additionally,
- Status
- Closed
- Sector
- Power Generation (CCGT), Water Supply and Storage, Telecommunications, Power Transmission, Hydro, Commercial
- Location
- Hastings, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crossover Cable Replacement at Lock and Dam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of replacing segments of circuits Dam Feeder No.1 and Dam Feeder No. 2 and the removal of unused cables located in the crossover system at Lock and Dam No. 2 in Hastings, MN. The cable segments requiring replacement start at manhole 1 and end at manhole 2 as shown in Figure 1-1 (see SOW Attachments). Dewatering the crossover system is required to access the cables. Additionally, the contractor will identify conductors currently in use and provide documentation showing the ca... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Hastings |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Telecommunications, Power Transmission, Hydro, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
