logo

Crossrail C300/C410: Western Running Tunnels

Sector: Bridge • Location: London, United Kingdom

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Crossrail C300/C410 London, United Kingdom £750M Value 2011-2015 Construction Dates NEC3-C Contract type 6.4 km Twin-bore running tunnel Crossrail is one of Europe's largest transport infrastructure projects. It is due to open in 2021 and will be named the Elizabeth line, after HM the Queen. Crossrail will transform rail transport by increasing central London ca

Project Information FAQ

Project Information

5 Q
The project “Crossrail C300/C410: Western Running Tunnels” is an infrastructure initiative in the Bridge sector, located in London, United Kingdom. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Crossrail C300/C410 London, United Kingdom £750M Value 2011-2015 Construction Dates NEC3-C Contract type 6.4 km Twin-bore running tunnel Crossrail is one of Europe's largest transport infrastructure projects. It is due to open in 2021 and will be named the Elizabeth line, after HM the Queen. Crossrail will transform rail transport by increasing central London capacity by 10% and cutting journey times across the city. The program will support the equivalent of 55,000 full-time jobs and stimulate regeneration and economic growth. C435 Farringdon Station works are split across two worksites—the eastern and western ticket halls. The scope includes the station building, East and West Ticket Hall construction, accesses, caverns, cross passages, reception chambers, lifts and escalator barrels using sprayed and in-situ concrete lining. Farringdon and Barbican tube stations, tube and national rail lines, and the listed Moorgate Spur sidings, under Smithfield Market, are on the site boundaries. Within this constrained urban environment, collaboration between wider contractors and stakeholders was paramount. Both C300 TBMs passed beneath Lord Hill’s Bridge. The 100-year old, steel-arched road bridge supports Royal Oak LU Station and is owned by Network Rail. In collaboration with Crossrail, we installed 1,225 piles beneath the bridge with tracks and platforms running on either side of the central pier, resulting in near zero settlement after the TBM drive. Added Value: £17m saved through our Optimised Contractor Involvement (OCI) proposalsC300 TBMs crossed with 850mm clearance from the top of the London Underground Northern line platform tunnel, and 520mm below the overlying escalator barrel, with no disruption to LU servicesWe used the TBM-driven tunnel (part of C300) as a pilot tunnel for C410 station tunnels at Bond Street and Tottenham Court Road, achieving a 7-month program savingTunnelling teams worked an eight-hour shift, the result of our research into the benefits of shortening the traditional twelve-hour shift to prevent fatigue Up to 3500 Instrumentation and monitoring points 1 M m³ tons debris redirected 1st onboard TBM refuge

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data