Crosswinds Transmission Pole Setting & Backfill
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This contract is for setting eight steel poles and delivering and placing approximately 280 yards of Self-Consolidating Concrete (SCC). These structures are located near the Arlington Municipal Airport (AWO) in Arlington, WA. DISTRICT crews will provide traffic control, assist with safety around high voltage lines, and deliver the poles on a trailer to each work site. The CONTRACTOR shall be respo
- Status
- Closed
- Sector
- Power Generation (CCGT), Airport, Commercial, Power Transmission, Steel, Cement, Government, Metal
- Location
- Arlington, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crosswinds Transmission Pole Setting & Backfill
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract is for setting eight steel poles and delivering and placing approximately 280 yards of Self-Consolidating Concrete (SCC). These structures are located near the Arlington Municipal Airport (AWO) in Arlington, WA. DISTRICT crews will provide traffic control, assist with safety around high voltage lines, and deliver the poles on a trailer to each work site. The CONTRACTOR shall be responsible for lifting and setting poles, concrete procurement, concrete pumping, mechanical compacti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Arlington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Airport, Commercial, Power Transmission, Steel, Cement, Government, Metal |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
