Crow Wing County Landfill Soil Processing Services
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Crow Wing County Land Services Department (County), through this Request For Bids (RFB), is seeking a qualified Contractor to partner with the County to process soils for future Landfill construction needs at the Crow Wing County Mixed Municipal Solid Waste Landfill SW-376. The work to be performed includes excavation, material production, and stockpiling in designated areas of the Landfill in acc
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Oil and Gas, Commercial, Government
- Location
- Brainerd, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crow Wing County Landfill Soil Processing Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crow Wing County Land Services Department (County), through this Request For Bids (RFB), is seeking a qualified Contractor to partner with the County to process soils for future Landfill construction needs at the Crow Wing County Mixed Municipal Solid Waste Landfill SW-376. The work to be performed includes excavation, material production, and stockpiling in designated areas of the Landfill in accordance with the specifications of the Landfill. The Contractor shall be responsible for the remo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Brainerd |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Oil and Gas, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
