Crowe Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Crowe - Existing Tenant, Crowe Llc Is Downsizing And Retaining Suite 2900. Minor Alterations Proposed Are To Demise And Separate Suite 2900 Into Two Suites: 2900 & 2925. Interior Alterations To Include New Exit Doors For Both Suites, New Demising Partition And New Breakroom In Suite 2900. Existing Suspended Ceiling System To Remain. Lighting And Electrical To Be Reconfigured To Accommodate New Lay
- Status
- Prospective
- Sector
- Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Tampa, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crowe Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Crowe - Existing Tenant, Crowe Llc Is Downsizing And Retaining Suite 2900. Minor Alterations Proposed Are To Demise And Separate Suite 2900 Into Two Suites: 2900 & 2925. Interior Alterations To Include New Exit Doors For Both Suites, New Demising Partition And New Breakroom In Suite 2900. Existing Suspended Ceiling System To Remain. Lighting And Electrical To Be Reconfigured To Accommodate New Layout Sq Ft:4123 |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tampa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
