logo

Crowfoot Lift Station and Truck Fill

Bid results · Alberta · Last reported Aug 2024

Source: Dodge USA

Project
Bid Results

The main items of Work of this Contract include Supply and install lift station pumps and associated equipment Supply and install electrical, instrumentation, and control Supply and install check valve and overflow piping. Locate and abandon existing piping. Supply and install 3-inch truck fill piping and valves to provide a side fill and overhead fill Site grading and surface works Chain link fen

Status
Closed
Sector
Steel, Automotive, Power Generation (CCGT), Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage
Location
Castor, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Crowfoot Lift Station and Truck Fill

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Crowfoot Lift Station and Truck Fill” is an infrastructure initiative in the Steel sector, located in Castor, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main items of Work of this Contract include Supply and install lift station pumps and associated equipment Supply and install electrical, instrumentation, and control Supply and install check valve and overflow piping. Locate and abandon existing piping. Supply and install 3-inch truck fill piping and valves to provide a side fill and overhead fill Site grading and surface works Chain link fencing with vehicle and man gate Construction of a raised working platform (steel structure) Pump s...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Castor

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Automotive, Power Generation (CCGT), Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project