Crowley High School Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project Scope The anticipated scope of work for this proposal is as follows: Replacement on site shall occur while the school remains occupied and in use during the construction of the new school project. Selective demolition of the existing campus will be required, and portions of the existing facility and site will remain. The replacement High School will add approximately 300,000 SF and will be
- Status
- Closed
- Sector
- Steel, Government, Metal, Commercial, Education
- Location
- Crowley, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crowley High School Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Scope The anticipated scope of work for this proposal is as follows: Replacement on site shall occur while the school remains occupied and in use during the construction of the new school project. Selective demolition of the existing campus will be required, and portions of the existing facility and site will remain. The replacement High School will add approximately 300,000 SF and will be multistory structural steel framing over crawlspace and load bearing CMU construction over crawl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Crowley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Government, Metal, Commercial, Education |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
