Crown Area Water Main Replacement
Closed · California · Last reported Jan 2024
Source: Dodge USA
The Work shall consist of, but not limited to, abandoning existing water main piping and appurtenances, furnishing and installing new water main piping and appurtenances, repair of the trench and asphalt, adjustment of water valve boxes, traffic control, water pollution control, and all related work.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Mass Transit, Consumer Products, Government, Rail, Commercial
- Location
- Fullerton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crown Area Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work shall consist of, but not limited to, abandoning existing water main piping and appurtenances, furnishing and installing new water main piping and appurtenances, repair of the trench and asphalt, adjustment of water valve boxes, traffic control, water pollution control, and all related work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fullerton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Mass Transit, Consumer Products, Government, Rail, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
