Crown Lower Quad Wireless and CCURE
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Modification to existing telecommunications rooms, removing and replacing select existing data cabling with new cat6 data cables and adding Wireless Access Points (WAP's) throughout buildings. In addition, modification to exterior doors with CCURE electronic security system and hardware
- Status
- Closed
- Sector
- Broadband, Commercial, Power Transmission, Telecommunications, Power Generation (CCGT), Road, Manufacturing (Industrial)
- Location
- Santa Cruz, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crown Lower Quad Wireless and CCURE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modification to existing telecommunications rooms, removing and replacing select existing data cabling with new cat6 data cables and adding Wireless Access Points (WAP's) throughout buildings. In addition, modification to exterior doors with CCURE electronic security system and hardware |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Cruz |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Commercial, Power Transmission, Telecommunications, Power Generation (CCGT), Road, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
