Crown Point Trail and Parking Area
Sector: Water Supply and Storage • Location: Cascade, Idaho, United States of America
Source: Dodge
This work consists of creating a firm and stable trail surface for 2.7 miles, expanding and paving the existing trailhead, formalizing a beach access trail, repairing a slope erosion issue, adding a vault toilet and in general modifying the trail as needed to meet the requirements of the Architectural Barriers Act. Project length: 2.7 miles Tentative Fixed Completion Date: Fall 2026 (Once solicita
- Status
- Under Construction
- Sector
- Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Car parking, Automotive, Waste Processing and Treatment
- Location
- Cascade, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crown Point Trail and Parking Area
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding, construction documents |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work consists of creating a firm and stable trail surface for 2.7 miles, expanding and paving the existing trailhead, formalizing a beach access trail, repairing a slope erosion issue, adding a vault toilet and in general modifying the trail as needed to meet the requirements of the Architectural Barriers Act. Project length: 2.7 miles Tentative Fixed Completion Date: Fall 2026 (Once solicitation is issued, see SF 1442, Block 11) Estimated Price Range: $700,000-$2,000,000 Location: 69 mi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Cascade |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
