Crown Point Trail and Parking Area
Sector: Car parking • Location: Cascade, Idaho, United States of America
Source: Dodge USA
The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed project is to rehabilitate approx. 2.7 miles of the Crown Point Trail on Lake Cascade with grading to provide an accessible trail with an engineered surface and drainage, and to rehabilitate and address erosion prone areas. Also included is an improved vehicle turnaround, gate closu
- Status
- Under Construction
- Sector
- Car parking, Automotive, Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Rail, Commercial
- Location
- Cascade, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crown Point Trail and Parking Area
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding, Construction Documents |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed project is to rehabilitate approx. 2.7 miles of the Crown Point Trail on Lake Cascade with grading to provide an accessible trail with an engineered surface and drainage, and to rehabilitate and address erosion prone areas. Also included is an improved vehicle turnaround, gate closure, and trailhead formalized parking area with engineered surface and designated accessible parki... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Cascade |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Rail, Commercial |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
