logo
ProjectBid Results

CRPWSC System Twinning - Phase 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The work involves the construction of a 600 mm DR25 PVC diameter pipeline from the Acheson Industrial Area to the City of Spruce Grove, which includes approximately: Pre-construction and post-construction alignment LiDAR, and photos 8,400 metres of 600 mm dia. PVC DR25 water pipeline. (3,100 meter will be paralleling CN R.o.W) 280 metres of 550 mm dia. HDPE DR11 water pipeline. One Trenchless High

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment
Location
Spruce Grove, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CRPWSC System Twinning - Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CRPWSC System Twinning - Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Spruce Grove, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work involves the construction of a 600 mm DR25 PVC diameter pipeline from the Acheson Industrial Area to the City of Spruce Grove, which includes approximately: Pre-construction and post-construction alignment LiDAR, and photos 8,400 metres of 600 mm dia. PVC DR25 water pipeline. (3,100 meter will be paralleling CN R.o.W) 280 metres of 550 mm dia. HDPE DR11 water pipeline. One Trenchless Highway Crossings HWY 16A 900 mm dia. steel casing c/w 600 mm dia. PVC DR25 water pipe. Six Trenchles...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Spruce Grove

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project