CRPWSC System Twinning - Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work involves the construction of a 600 mm DR25 PVC diameter pipeline from the Acheson Industrial Area to the City of Spruce Grove, which includes approximately: Pre-construction and post-construction alignment LiDAR, and photos 8,400 metres of 600 mm dia. PVC DR25 water pipeline. (3,100 meter will be paralleling CN R.o.W) 280 metres of 550 mm dia. HDPE DR11 water pipeline. One Trenchless High
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Spruce Grove, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CRPWSC System Twinning - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work involves the construction of a 600 mm DR25 PVC diameter pipeline from the Acheson Industrial Area to the City of Spruce Grove, which includes approximately: Pre-construction and post-construction alignment LiDAR, and photos 8,400 metres of 600 mm dia. PVC DR25 water pipeline. (3,100 meter will be paralleling CN R.o.W) 280 metres of 550 mm dia. HDPE DR11 water pipeline. One Trenchless Highway Crossings HWY 16A 900 mm dia. steel casing c/w 600 mm dia. PVC DR25 water pipe. Six Trenchles... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Spruce Grove |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
