logo
ProjectClosed

CRPWSC Water System Twinning Phase 3

Sector: Water Supply and Storage • Location: Stony Plain, Alberta, Canada

Source: Dodge USA

The Capital Region Parkland Water Services Commission (CRPWSC) invites Prequalification Submissions from interested contractors for the construction of a new 450 mm and 350 mm diameter water transmission pipeline and fill station construction. It is the intention of the Commission to prequalify General Contractors with water transmission pipeline installation (open cut, vertical trenching), trench

Status
Closed
Sector
Water Supply and Storage, Tunnel, Government, Commercial, Waste Processing and Treatment
Location
Stony Plain, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CRPWSC Water System Twinning Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CRPWSC Water System Twinning Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Stony Plain, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Capital Region Parkland Water Services Commission (CRPWSC) invites Prequalification Submissions from interested contractors for the construction of a new 450 mm and 350 mm diameter water transmission pipeline and fill station construction. It is the intention of the Commission to prequalify General Contractors with water transmission pipeline installation (open cut, vertical trenching), trenchless pipe installation (micro tunneling, auger boring), and environmental experience, as well as ...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Stony Plain

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Tunnel, Government, Commercial, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project