Crunch Fitness - (Olathe, KS)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This is a crunch fitness (a national fitness chain) tenant improvement with locker rooms, bathrooms, showers, tanning, hydromassage equipment, including associated hvac distribution, electrical distribution, and plumbing. Crunch fitness is leasing 39,288 sf in an existing building. Their new space is currently vacant.Changes/scope to exterior: new facade and exterior door infillno site changes are
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Olathe, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Crunch Fitness - (Olathe, KS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a crunch fitness (a national fitness chain) tenant improvement with locker rooms, bathrooms, showers, tanning, hydromassage equipment, including associated hvac distribution, electrical distribution, and plumbing. Crunch fitness is leasing 39,288 sf in an existing building. Their new space is currently vacant.Changes/scope to exterior: new facade and exterior door infillno site changes are proposed under this permit. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Olathe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
