Crunch Fitness Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Interior Repairs/renovation To Fitness Club "Crunch Fitness". The Project Calls For The Removal Of Some Petition Walls, But No Structural Alterations. The Scope Includes Some Minor Changes To Existing Mechanical, Electrical, Fire Protection And Plumbing Systems. No Exterior Changes.no Change To Egress And Or Life Safety.| Fsttrk Long Form/alteration Permit Comm
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crunch Fitness Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior Repairs/renovation To Fitness Club "Crunch Fitness". The Project Calls For The Removal Of Some Petition Walls, But No Structural Alterations. The Scope Includes Some Minor Changes To Existing Mechanical, Electrical, Fire Protection And Plumbing Systems. No Exterior Changes.no Change To Egress And Or Life Safety.| Fsttrk Long Form/alteration Permit Comm |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
