logo
ProjectUnder Construction

Crusoe Texas AI Data Centre Project with Microsoft

The owner, status and timeline of this project. A free account opens every field.

Source: The Times of India

Crusoe is developing a data centre project in Abilene, Texas, originally planned as a cryptocurrency mining facility but revised for AI infrastructure demand. The project includes two new AI factory facilities and an on-site power plant generating 900 megawatts for Microsoft. This development is adjacent to a larger campus being constructed for OpenAI and Oracle. Microsoft's plant will be larger t

Status
Under Construction
Sector
Data Center, Power Generation (CCGT), Manufacturing (Industrial)
Location
Abilene, Texas, United States of America
Updated
22 Jul 2026
Source
The Times of India

ConstructChat

Ask ConstructChat about Crusoe Texas AI Data Centre Project with Microsoft

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Crusoe Texas AI Data Centre Project with Microsoft” is an infrastructure initiative in the Data Center sector, located in Abilene, Texas, United States. Taiyo aggregates data on it from The Times of India.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Crusoe is developing a data centre project in Abilene, Texas, originally planned as a cryptocurrency mining facility but revised for AI infrastructure demand. The project includes two new AI factory facilities and an on-site power plant generating 900 megawatts for Microsoft. This development is adjacent to a larger campus being constructed for OpenAI and Oracle. Microsoft's plant will be larger than the 350-megawatt gas-fired power plant attached to the OpenAI and Oracle project.

Original sector

Technology

Location

Country

United States of America (USA)

State

Texas

City

Abilene

Source

Source

The Times of India

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project