Cruz Hotel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construction of a six-story, 232-room hotel with 11,498 square feet of ground floor retail, banquet and conference space, restaurant, and bar, parking structure below ground, which would consist of three underground levels of parking that contain 214 spaces
- Status
- Prospective
- Sector
- Consumer Products, Hotel, Raw Materials, Car parking, Automotive, Commercial
- Location
- Santa Cruz, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cruz Hotel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a six-story, 232-room hotel with 11,498 square feet of ground floor retail, banquet and conference space, restaurant, and bar, parking structure below ground, which would consist of three underground levels of parking that contain 214 spaces |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Cruz |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Hotel, Raw Materials, Car parking, Automotive, Commercial |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
