Cruzville Fire Suppression Pumping Station Construction
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: Dodge
The project is located at a site approximately 1/4 mile southwest of Cruzville, NM, within Catron County, and includes the construction of an overhead water fill station, including pitless booster pump, electrical, piping, backpressure valve, gate valves, fittings, etc. and also includes the installation of approximately 1,040 LF of 6 C-900 DR18 PVC waterline, 6 fire hydrant assembly, 2 combinatio
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Reserve, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cruzville Fire Suppression Pumping Station Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located at a site approximately 1/4 mile southwest of Cruzville, NM, within Catron County, and includes the construction of an overhead water fill station, including pitless booster pump, electrical, piping, backpressure valve, gate valves, fittings, etc. and also includes the installation of approximately 1,040 LF of 6 C-900 DR18 PVC waterline, 6 fire hydrant assembly, 2 combination air/ vacuum release valve and native grass seeding to provide a complete and functional project |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Reserve |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
