Cryogenics Facility Valve Replacement
Closed · Massachusetts · Last reported Apr 2025
Source: Dodge
The work includes furnishing all materials, equipment, labor, supervision and incidentals necessary for the critical isolation and control valves, inspection of the Liquid Oxygen Storage Tank and replacement of associated relief valves, as well as an overhaul of all four main air compressors at the Deer Island Treatment Plant Cryogenics Facility.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, LNG
- Location
- Winthrop, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cryogenics Facility Valve Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes furnishing all materials, equipment, labor, supervision and incidentals necessary for the critical isolation and control valves, inspection of the Liquid Oxygen Storage Tank and replacement of associated relief valves, as well as an overhaul of all four main air compressors at the Deer Island Treatment Plant Cryogenics Facility. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Winthrop |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, LNG |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
