Crystal City Bike Lane Paving Project
Under construction · Virginia · Last reported May 2025
Source: ARLnow
A bike lane paving project in Crystal City to add a new bike segment on S. Clark Street between 20th Street S. and 23rd Street S., widening the current lane into a two-cycle track, and adding a one-way, southbound protected bike lane along Crystal Drive between 20th Street S. and 23rd Street S. The project involves paving work causing road closures and crosswalk closures.
- Status
- Under Construction
- Sector
- Road, Government
- Location
- Arlington, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- ARLnow
ConstructChat
Ask ConstructChat about Crystal City Bike Lane Paving Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A bike lane paving project in Crystal City to add a new bike segment on S. Clark Street between 20th Street S. and 23rd Street S., widening the current lane into a two-cycle track, and adding a one-way, southbound protected bike lane along Crystal Drive between 20th Street S. and 23rd Street S. The project involves paving work causing road closures and crosswalk closures. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Virginia |
City | Arlington |
Source
Source | ARLnow |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
