logo

Crystal Valley Interchange Bridge Nighttime Closures

Sector: Bridge • Location: Colorado, United States

Source: Douglas County

Project
Under Construction

Nighttime closures of I-25 are scheduled for the Crystal Valley interchange bridge from March 9 to March 12, 2025. These closures are part of ongoing construction activities to improve the interchange.

Status
Under Construction
Sector
Bridge
Location
Colorado, United States of America
Updated
22 Jul 2026
Source
Douglas County

ConstructChat

Ask ConstructChat about Crystal Valley Interchange Bridge Nighttime Closures

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Crystal Valley Interchange Bridge Nighttime Closures” is an infrastructure initiative in the Bridge sector, located in Colorado, United States. Taiyo aggregates data on it from Douglas County.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Nighttime closures of I-25 are scheduled for the Crystal Valley interchange bridge from March 9 to March 12, 2025. These closures are part of ongoing construction activities to improve the interchange.

Location

Country

United States of America (USA)

State

Colorado

Source

Source

Douglas County

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project