logo
ProjectComplete

CS 1004/E B HAMILTON DR FROM RUTLAND RD TO CARPENTER RD

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

0.88 MILES OF WIDENING OF CS 1004 E.B. HAMILTON DRIVE FROM RUTLAND ROAD TO CARPENTER ROAD IN TIFT COUNTY.PROJECT WILL ALSO CONSIST OF THE EXTENSION OF TWO CULVERTS WITHIN LIMITS TO COMPENSATE FOR THE WIDENING. BETWEEN RUTLAND ROAD AND CARPENTER ROAD, EB HAMILTON DRIVE IS A 2-LANE ROAD IN TIFTON, GEORGIA WITH A LEFT TURN LANE IN THE WESTBOUND DIRECTION AT THE WEST HAVEN SENIOR VILLAGE. THE GREATER

Status
Closed
Sector
Raw Materials, Commercial, Road, Residential
Location
Tifton, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CS 1004/E B HAMILTON DR FROM RUTLAND RD TO CARPENTER RD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CS 1004/E B HAMILTON DR FROM RUTLAND RD TO CARPENTER RD” is an infrastructure initiative in the Raw Materials sector, located in Tifton, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

0.88 MILES OF WIDENING OF CS 1004 E.B. HAMILTON DRIVE FROM RUTLAND ROAD TO CARPENTER ROAD IN TIFT COUNTY.PROJECT WILL ALSO CONSIST OF THE EXTENSION OF TWO CULVERTS WITHIN LIMITS TO COMPENSATE FOR THE WIDENING. BETWEEN RUTLAND ROAD AND CARPENTER ROAD, EB HAMILTON DRIVE IS A 2-LANE ROAD IN TIFTON, GEORGIA WITH A LEFT TURN LANE IN THE WESTBOUND DIRECTION AT THE WEST HAVEN SENIOR VILLAGE. THE GREATER TIFT OUNTY YEAR 2028 COMPREHENSIVE PLAN'S RECOMMENDS THE LAND USE ALONG EB HAMILTON DRIVE CHANGE FROM AGRICULTURAL TO URBAN COMMERCIAL CORRIDOR IN THE FUTURE. THIS WILL CONTRIBUTE A HIGHER PROJECTED TRAFFIC GROWTH RATE ON EB HAMILTON DRIVE AND INCREASING VOLUMES OF TRAFFIC, INCLUDING INCREASING TURNING MOVEMENTS INTO BUSINESSES AS THEY ARE DEVELOPED. THE PROPOSED WIDENING OF EB HAMILTON DRIVE WILL IMPROVE TRAFFIC FLOW AS THIS AREA DEVELOPS WITH NEW BUSINESS ESTABLISHMENTS AND NEARBY RESIDENTIAL LAND USES.

Location

Country

United States of America (USA)

State

Georgia

City

Tifton

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial, Road, Residential

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project