CS 111/BUICE ROAD @ JOHNS CREEK
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project consists of replacing the existing roadway bridge on CR 111/Buice Road over Johns Creek in Fulton County. The bridge was built in 1964 and has a sufficiency rating of 57.7. Currently, the bridge is weight limited, does not meet current bridge width requirements, and lacks pedestrian facilities. Additionally, the bridge is at risk of flooding during severe storming events. The propose
- Status
- Under Construction
- Sector
- Bridge, Road, Government
- Location
- Johns Creek, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CS 111/BUICE ROAD @ JOHNS CREEK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of replacing the existing roadway bridge on CR 111/Buice Road over Johns Creek in Fulton County. The bridge was built in 1964 and has a sufficiency rating of 57.7. Currently, the bridge is weight limited, does not meet current bridge width requirements, and lacks pedestrian facilities. Additionally, the bridge is at risk of flooding during severe storming events. The proposed replacement will meet current design standards for load and bridge width. The proposed typical section includes two 12-foot lanes, one lane in each direction, with urban shoulders and pedestrian facilities. To mitigate the risk of flooding, the bridge elevation will be increased above the flood stage. The design speed is 45 mph. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Johns Creek |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
