logo

CS 1143/CEMETERY ST FROM SR 360 TO CS 1387/WEST ATLANTA ST

Sector: Automotive • Location: Marietta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

CS 1143/Cemetery St from SR 360 to CS 1387/West Atlanta St: Cemetery St and West Atlanta St, Marietta, Cobb County, GA. The Cemetery Trail project proposes the conversion of existing Cemetery St into a 10’ paved multi-use trail, for a length of approximately 845’ at Powder Springs St. This section of Cemetery St will be permanently closed to traffic. The remaining part of Cemetery St to West Atlan

Project Information FAQ

Project Information

4 Q
The project “CS 1143/CEMETERY ST FROM SR 360 TO CS 1387/WEST ATLANTA ST” is an infrastructure initiative in the Automotive sector, located in Marietta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

CS 1143/Cemetery St from SR 360 to CS 1387/West Atlanta St: Cemetery St and West Atlanta St, Marietta, Cobb County, GA. The Cemetery Trail project proposes the conversion of existing Cemetery St into a 10’ paved multi-use trail, for a length of approximately 845’ at Powder Springs St. This section of Cemetery St will be permanently closed to traffic. The remaining part of Cemetery St to West Atlanta St (715’) will be reconstructed to provide shared use for bicycles with one 10’ lane in each direction and appropriate shared lane markings to indicate that it is a shared facility between bikes and cars. A trail “entryway” from Powder Springs St is proposed at the western terminus of the project, with stamped asphalt and pedestrian furnishings. Along Cemetery St, easements will be required on 11 parcels and ROW acquisition on 2. Landscaping will be included along Cemetery Trail (bushes and trees). 1300 LF of 6’ to 6.5’ sidewalks is proposed along West Atlanta St.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data