logo

CS 603/RAILROAD ST FM CS 565/HEMLOCK ST TO CS 565/HEMLOCK ST

Sector: Cement • Location: Porterdale, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Porterdale Depot Rehabilitation Phase 2, Multi-Use Trail & Pedestrian Improvements. The depot rehab involves: providing floor, wall, stair, & ceiling finishes in the passenger waiting room; installing sink & casework in waiting room; patching the floor in freight room where restrooms were to be constructed in previous phase; installing mechanical system for waiting room within new mechanical room

Status
Closed
Sector
Cement, Mass Transit, Power Generation (CCGT), Rail, Car parking, Automotive, Government
Location
Porterdale, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CS 603/RAILROAD ST FM CS 565/HEMLOCK ST TO CS 565/HEMLOCK ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CS 603/RAILROAD ST FM CS 565/HEMLOCK ST TO CS 565/HEMLOCK ST” is an infrastructure initiative in the Cement sector, located in Porterdale, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Porterdale Depot Rehabilitation Phase 2, Multi-Use Trail & Pedestrian Improvements. The depot rehab involves: providing floor, wall, stair, & ceiling finishes in the passenger waiting room; installing sink & casework in waiting room; patching the floor in freight room where restrooms were to be constructed in previous phase; installing mechanical system for waiting room within new mechanical room to be located in freight room; providing lighting and power distribution system in the Depot; & installing plumbing system for waiting room sink. The multi-use trail improvements involve site clearing and grading, & the construction of ± 1,138 LF of 12' wide concrete sidewalk starting at SR 81 at Hemlock St running NW along the abandoned & previously donated railway along Hemlock Alley B (roughly parallel to Hemlock St) to a connection point with the existing trail in the city park.

Location

Country

United States of America (USA)

State

Georgia

City

Porterdale

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Cement, Mass Transit, Power Generation (CCGT), Rail, Car parking, Automotive, Government

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project