CS 603/RAILROAD ST FM CS 565/HEMLOCK ST TO CS 565/HEMLOCK ST
Sector: Cement • Location: Porterdale, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Porterdale Depot Rehabilitation Phase 2, Multi-Use Trail & Pedestrian Improvements. The depot rehab involves: providing floor, wall, stair, & ceiling finishes in the passenger waiting room; installing sink & casework in waiting room; patching the floor in freight room where restrooms were to be constructed in previous phase; installing mechanical system for waiting room within new mechanical room
- Status
- Closed
- Sector
- Cement, Mass Transit, Power Generation (CCGT), Rail, Car parking, Automotive, Government
- Location
- Porterdale, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CS 603/RAILROAD ST FM CS 565/HEMLOCK ST TO CS 565/HEMLOCK ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Porterdale Depot Rehabilitation Phase 2, Multi-Use Trail & Pedestrian Improvements. The depot rehab involves: providing floor, wall, stair, & ceiling finishes in the passenger waiting room; installing sink & casework in waiting room; patching the floor in freight room where restrooms were to be constructed in previous phase; installing mechanical system for waiting room within new mechanical room to be located in freight room; providing lighting and power distribution system in the Depot; & installing plumbing system for waiting room sink. The multi-use trail improvements involve site clearing and grading, & the construction of ± 1,138 LF of 12' wide concrete sidewalk starting at SR 81 at Hemlock St running NW along the abandoned & previously donated railway along Hemlock Alley B (roughly parallel to Hemlock St) to a connection point with the existing trail in the city park. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Porterdale |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Mass Transit, Power Generation (CCGT), Rail, Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
