CS 688/LAFAYETTE RD @ CS 552/HARKER RD IMPROVEMENTS
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project will construct a 10 foot wide multi-use trail from Frank Gleason Park along Harker Road to the intersection with Lafayette Road, and replacing the sidewalk around Barnhardt Circle.
On Harker Road, the trail will be built on the north side only. Curb and gutter will also be installed along this side only. On Barnhardt Circle, the proposed sidewalk replacement will be constructed
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CS 688/LAFAYETTE RD @ CS 552/HARKER RD IMPROVEMENTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will construct a 10 foot wide multi-use trail from Frank Gleason Park along Harker Road to the intersection with Lafayette Road, and replacing the sidewalk around Barnhardt Circle. On Harker Road, the trail will be built on the north side only. Curb and gutter will also be installed along this side only. On Barnhardt Circle, the proposed sidewalk replacement will be constructed on the outside of Barnhartt and will vary from 6-foot to 10-foot wide. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
