CS 751/CR 1317/DAVIS ST @ 1 LOC &CS 753/PINECREST LN @ 1 LOC
Sector: Car parking • Location: Braselton, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project would provide sidewalk, curb and gutter, and pedestrian lighting. On Davis Street between Pinecrest Lane and Keys Drive, the proposed improvements would include new 24-in curb and gutter, a closed drainage system, and 6 ft sidewalk connecting Pinecrest Lane to Keys Drive on the northside, resulting in approximately 2050 LF in length on the northside; and 600 LF of sidewalk on
- Status
- Under Construction
- Sector
- Car parking, Road, Government, Automotive, Waste Processing and Treatment
- Location
- Braselton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CS 751/CR 1317/DAVIS ST @ 1 LOC &CS 753/PINECREST LN @ 1 LOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project would provide sidewalk, curb and gutter, and pedestrian lighting. On Davis Street between Pinecrest Lane and Keys Drive, the proposed improvements would include new 24-in curb and gutter, a closed drainage system, and 6 ft sidewalk connecting Pinecrest Lane to Keys Drive on the northside, resulting in approximately 2050 LF in length on the northside; and 600 LF of sidewalk on the southside. Pedestrian lighting on the north side of Davis Street for approximately 2,150-ft and 650-ft on the southside. On Pinecrest Lane between Davis Street and SR 124 the proposed improvements would include new 24-in curb and gutter, a closed drainage system on both sides of the street, and a 6 ft sidewalk on the west side of PinecrestLane, for a total of 1,290 LF. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Braselton |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive, Waste Processing and Treatment |
Article published date | 2024-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
