CS 862/PACE STREET FROM FLOYD STREET TO SR 12/US 278 - LCI
Sector: Cement • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project will construct new pedestrian and bicycle facilities by giving Pace Street a classic road diet within its current four-lane transportation structure. New concrete sidewalks would be constructed for 0.4 miles along both sides of the corridor. After reducing the number of lanes from four to three, 5’ wide dedicated bicycle lanes would be introduced and the roadway milled, resurfaced and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will construct new pedestrian and bicycle facilities by giving Pace Street a classic road diet within its current four-lane transportation structure. New concrete sidewalks would be constructed for 0.4 miles along both sides of the corridor. After reducing the number of lanes from four to three, 5’ wide dedicated bicycle lanes would be introduced and the roadway milled, resurfaced and restriped. Other enhancements proposed in this project include raised curbs, landscaped center medians in two locations for pedestrian crossings and refuges, pedestrian scale lighting and other street furnishings, ADA-accessible curb ramps, and street trees and shrub plantings. Curb extensions are proposed between Floyd and Stallings in order to define and protect existing parallel parking, and a wide landscape strip is proposed between Stallings and 278 that might be converted to parallel parking as needed by future redevelopment. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
