CSA 43W Raisin City Groundwater Well
Sector: Power Generation (CCGT) • Location: Raisin City, California, United States of America
Source: Dodge USA
The work to be done consists of, in general, furnishing all labor, materials and equipment necessary to drill and equip a water well at the location indicated on the plans and connect to the existing water distribution main in the community of Raisin City, CA, in accordance with the Plans and Specifications. Electrical work, grading, fence removal and installation and other appurtenant work as ind
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Raisin City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CSA 43W Raisin City Groundwater Well
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done consists of, in general, furnishing all labor, materials and equipment necessary to drill and equip a water well at the location indicated on the plans and connect to the existing water distribution main in the community of Raisin City, CA, in accordance with the Plans and Specifications. Electrical work, grading, fence removal and installation and other appurtenant work as indicated on the plans and specifications is also part of the work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Raisin City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
