CSAh 18 Project - Arboretum Area
Sector: Water Supply and Storage • Location: Cologne, Minnesota, United States of America
Source: Dodge USA
Work to be performed consists of the furnishing of all materials, equipment, labor and supplies to complete the work as shown on the plans and specifications on file with the Carver County Engineer's Office, Public Works Division, 11360 Highway 212, Suite 1, Cologne, MN 553228016.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Waste Processing and Treatment, Residential
- Location
- Cologne, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CSAh 18 Project - Arboretum Area
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed consists of the furnishing of all materials, equipment, labor and supplies to complete the work as shown on the plans and specifications on file with the Carver County Engineer's Office, Public Works Division, 11360 Highway 212, Suite 1, Cologne, MN 553228016. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Cologne |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Waste Processing and Treatment, Residential |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
