CSAH 5 Bridge Replacement
Sector: Bridge • Location: Buffalo, Minnesota, United States of America
Source: Dodge USA
Construct New Bridge No. 86536 and Approaches.LENGTH: 0.170 miles Approximate major items of work are: Prestressed Concrete Beams 22RB 846 Lin Ft Structural Concrete (3B52) 118 Cu Yd Bridge Slab Concrete (3YHPC-M) 6,160 Sq Ft CIP Concrete Piling 12 600 Lin Ft Random Riprap Class V 1,030 Cu Yd Common Embankment 8,584 Cu Yd Type SP 9.5 Wearing Course Mix (3,C) 835 Ton
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construct New Bridge No. 86536 and Approaches.LENGTH: 0.170 miles Approximate major items of work are: Prestressed Concrete Beams 22RB 846 Lin Ft Structural Concrete (3B52) 118 Cu Yd Bridge Slab Concrete (3YHPC-M) 6,160 Sq Ft CIP Concrete Piling 12 600 Lin Ft Random Riprap Class V 1,030 Cu Yd Common Embankment 8,584 Cu Yd Type SP 9.5 Wearing Course Mix (3,C) 835 Ton |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
