logo
ProjectClosed

CSAH 70 Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The approximate quantities of the major work for are as follows: SP 031-670-009 CSAH 70 Bridge Replacement over Swan River Excavation Common P 1526 CY Select Granular Embankment CV 11466 CY Aggregate Base CV Class 5 1182 TON Type SP 12.5 Wearing Course Mix 2;C 603 TON Bridge Slab Concrete 3YHPC-M P 2,818 SF CIP Concrete Piling 12 510 LF CIP Concrete Piling 16 680 LF Remove Existing Bridge 1 LS SP

Status
Closed
Sector
Government, Bridge, Cement, Commercial, Road
Location
Grand Rapids, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CSAH 70 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CSAH 70 Bridge Replacement” is an infrastructure initiative in the Government sector, located in Grand Rapids, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The approximate quantities of the major work for are as follows: SP 031-670-009 CSAH 70 Bridge Replacement over Swan River Excavation Common P 1526 CY Select Granular Embankment CV 11466 CY Aggregate Base CV Class 5 1182 TON Type SP 12.5 Wearing Course Mix 2;C 603 TON Bridge Slab Concrete 3YHPC-M P 2,818 SF CIP Concrete Piling 12 510 LF CIP Concrete Piling 16 680 LF Remove Existing Bridge 1 LS SP 031-670-010 CSAH 70 Bridge Replacement over Trout Creek Excavation Common P 5174 CY Select Granul...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Grand Rapids

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Bridge, Cement, Commercial, Road

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project