CSIC Wind Power Tacheng Emin 1.3 million kilowatt wind power project (1300MW)

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The project comprises the construction of CSIC Wind Power Tacheng Emin 1.3 million kilowatt wind power base, which started construction on September 26, 2024. It is located at Emin, Tacheng Prefecture, Xinjiang, China. The project of CSSC Wind Power Tacheng Emin is jointly developed by a joint venture company established by China Shipbuilding Group Wind Power Development Co., Ltd., Xinjiang Wuta

Project Information FAQ

Project Information

4 Q
The project “CSIC Wind Power Tacheng Emin 1.3 million kilowatt wind power project (1300MW)” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction of CSIC Wind Power Tacheng Emin 1.3 million kilowatt wind power base, which started construction on September 26, 2024. It is located at Emin, Tacheng Prefecture, Xinjiang, China. The project of CSSC Wind Power Tacheng Emin is jointly developed by a joint venture company established by China Shipbuilding Group Wind Power Development Co., Ltd., Xinjiang Wuta Carbon Sink Technology Service Co., Ltd. and China Energy Engineering Group Xinjiang Electric Power Design Institute Co., Ltd. The total installed capacity of the project is 1300MW, with an investment of $802.4m or 5.626 billion yuan, supporting the construction of 260,000 kWh energy storage facilities, and plans to install 120 wind turbines. It will be completed in April 2026. After the project is completed, the average annual power generation hours will be 2,492 hours, and 3.239 billion kilowatt-hours of green electricity can be generated annually. It can save about 1.0074 million tons of standard Huaihe coal each year, reduce carbon dioxide emissions by about 2.75 million tons, reduce sulfur dioxide emissions by about 847 tons, and nitrogen oxide emissions by about 815 tons. It can also reduce a large amount of ash and smoke emissions each year, save water, and reduce corresponding wastewater emissions. https://wind.imarine.cn/news/101624.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data