CSO 007 Diversion Sewer Project
Sector: Bridge • Location: Washington
Source: District of Columbia Water and Sewer Authority (DC Water)
DC Water’s engineers realized that part of the Clean Rivers Project would have to be built first before the major 11th Street Bridge Project abutments and ramps were put in place. The CSO 007 Diversion Sewer Project included diversion chambers to capture CSOs and a new sewer to deliver captured flows to the Anacostia River Tunnel.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | DC Water’s engineers realized that part of the Clean Rivers Project would have to be built first before the major 11th Street Bridge Project abutments and ramps were put in place. The CSO 007 Diversion Sewer Project included diversion chambers to capture CSOs and a new sewer to deliver captured flows to the Anacostia River Tunnel. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
