logo
ProjectCompleted

CSP-PV Hybrid Project

Completed · Dubai · Last reported Dec 2023

The CSP-PV hybrid project undertaken by Shanghai Electric Group in the Dubai desert has been fully operational since December 2023, generating over 3.6 billion kilowatt-hours of electricity and providing stable green power for 320,000 local households while reducing carbon dioxide emissions by more than 1.6 million metric tons annually.

Status
Closed
Sector
Solar, Power Generation (CCGT)
Location
Dubai, United Arab Emirates
Updated
22 Jul 2026
Source
CHINADAILY EPAPER

ConstructChat

Ask ConstructChat about CSP-PV Hybrid Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CSP-PV Hybrid Project” is an infrastructure initiative in the Solar sector, located in Dubai, Dubai, United Arab Emirates. Taiyo aggregates data on it from CHINADAILY EPAPER.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The CSP-PV hybrid project undertaken by Shanghai Electric Group in the Dubai desert has been fully operational since December 2023, generating over 3.6 billion kilowatt-hours of electricity and providing stable green power for 320,000 local households while reducing carbon dioxide emissions by more than 1.6 million metric tons annually.

Original sector

Energy

Location

Country

United Arab Emirates (UAE)

State

Dubai

City

Dubai

Source

Source

CHINADAILY EPAPER

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project