CSP-PV Hybrid Project
Completed · Dubai · Last reported Dec 2023
The CSP-PV hybrid project undertaken by Shanghai Electric Group in the Dubai desert has been fully operational since December 2023, generating over 3.6 billion kilowatt-hours of electricity and providing stable green power for 320,000 local households while reducing carbon dioxide emissions by more than 1.6 million metric tons annually.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Dubai, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- CHINADAILY EPAPER
ConstructChat
Ask ConstructChat about CSP-PV Hybrid Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The CSP-PV hybrid project undertaken by Shanghai Electric Group in the Dubai desert has been fully operational since December 2023, generating over 3.6 billion kilowatt-hours of electricity and providing stable green power for 320,000 local households while reducing carbon dioxide emissions by more than 1.6 million metric tons annually. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
State | Dubai |
City | Dubai |
Source
Source | CHINADAILY EPAPER |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
