logo
ProjectClosed

CSS Pipe Program Block 5 R&R

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The work to be performed, in general, includes the replacement of nearly 988 linear feet of sanitary sewer pipe located in the follow locations: 1) Mule Alley (33rd Street and 34th Street) 2) 16th Street (X Street and W street) 3) 49th / 50th Street Alley (Solons Alley and S Street) 4) W Street (21st Street and 22nd Street) Additional work includes replacing and reconnecting sewer services, rehabi

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
Location
Sacramento, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CSS Pipe Program Block 5 R&R

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CSS Pipe Program Block 5 R&R” is an infrastructure initiative in the Road sector, located in Sacramento, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work to be performed, in general, includes the replacement of nearly 988 linear feet of sanitary sewer pipe located in the follow locations: 1) Mule Alley (33rd Street and 34th Street) 2) 16th Street (X Street and W street) 3) 49th / 50th Street Alley (Solons Alley and S Street) 4) W Street (21st Street and 22nd Street) Additional work includes replacing and reconnecting sewer services, rehabilitating manholes, remove and replace manholes, pipe bursting, and other associated work. The Con...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Sacramento

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-09-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project