logo

CSU Chico - Plumas Hall Building Renewal

Sector: Commercial • Location: Chico, California, United States of America

Source: Dodge USA

Project
Construction Documents

Remodel the manufacturing labs 116 and 121 within Plumas Hall. This renovation includes moving several pieces of equipment to accommodate new machines, moving electrical service and compressed air for most of the machines (whether they are moved within the same room or between labs), replacing the roll-up door in lab 121 with a garage-type door, miscellaneous paint touch up, and miscellaneous meta

Status
Closed
Sector
Commercial, Metal, Car parking, Education, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Government
Location
Chico, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CSU Chico - Plumas Hall Building Renewal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CSU Chico - Plumas Hall Building Renewal” is an infrastructure initiative in the Commercial sector, located in Chico, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Remodel the manufacturing labs 116 and 121 within Plumas Hall. This renovation includes moving several pieces of equipment to accommodate new machines, moving electrical service and compressed air for most of the machines (whether they are moved within the same room or between labs), replacing the roll-up door in lab 121 with a garage-type door, miscellaneous paint touch up, and miscellaneous metal work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Chico

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Metal, Car parking, Education, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Government

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project